| Autor |
|
|
|
| to estimate the overhead floor |
|
|
| 2278 Beiträge - Forenlegende
|
|
|
<p>calibration base level, to ensure that in the range of three meters, the height of horizontal error shall not exceed + 1.5mm, and the whole floor shall not exceed + 2.5mm, then installed base and die-casting aluminum head. 5 install a static electric overhead floor, along the ground line with four floors, once again confirmed that the floor and the base and the panel perpendicular to the bottom line. If not vertical, must be adjusted. On this basis, the installation of </p>
<p>overhead floor. &nbsp; &nbsp; two, cutting the floor around the floor in the installation of the floor of the 1, the edge can be used to support the side edge of the floor cutting. 2 each edge in cutting the floors and walls, floor columns or other end, the floor must be measured, so that the cutting good floor can meet and combined profile on the wall outside the wall and cut the gap between the floor must be in 1.5mm, floor for irregular cutting with pillars or round </p>
<p>tube, must be measured accurately to ensure the coordination and the circular floor. At the same time, make sure that all the cutting floors must be fixed with the base (if necessary, use extra base) and maintain the level, smooth and orderly. &nbsp; &nbsp; three, the installation of the annex to the installation of the provisions of the annex to the floor of the annex, must comply with the anti-static floor series of the design specifications and standards of the 1. 2 floor </p>
<p>المن&#...amp;#1583; <br />
لوحا&#...amp;#1585; <br />
البل&#...amp;#1581; </p>
|
| Beitrag vom 24.04.2017 - 05:52 |
|
| Beiträge
| Autor
| Datum
|
|
| qizhenapp |
24.04.2017 - 05:52 |